.

 

    

Vocational Building
Madisonville CISD

Madisonville, Texas  2004
15,400 sq. ft new Vocational Building, including flexible wood-working areas and 12 metal shop welding stations, tool rooms, storage mezzanine, private office, break rooms, computer lab, and men's and women's locker rooms.  Features a covered outdoor working area which opens directly into the shop.
       
       
 

    

Jr. High Additions and Renovations
Madisonville CISD
Madisonville, Texas  2004
16,800 sq. ft. addition includes classrooms, science lab, media center, bandhall, and administration offices.  Project also included reconfiguration of parent pick-up and parking areas, as well as renovations to the kitchen and dining room.
 
       
 

    

Cafetorium
New Summerfield ISD
New Summerfield, Texas  2004
New cafetorium (17,800 sq. ft.) to serve the students of New Summerfield ISD.  Features UIL Stage, theatrical lighting & rigging, sound system, theatrical seating, and dining for 400 students. 
 
       
 

  

High School & Cafeteria
Chireno ISD 
Chireno, Texas  2004
Total area = 20,282 square feet.
New high school was situated to allow good access to the gym while separating high school and middle school students.  Both buildings feature terrazzo flooring and masonry construction.  The kitchen area features non-slip quarry tile.  High School also features completely updated science lab.
  
       
 

  Before    

Cafeteria Expansion and Upgrade
Alto ISD 
Alto, Texas  2003
8,300 sq. ft. cafeteria was expanded to seat 360 students, the serving line was expanded, as well as the storage areas.  The upgrades included a UIL Stage, theatrical lighting and rigging, and a sound system.
After    
       
 

  Before     

Cafeteria Renovations
Diboll ISD 
Diboll, Texas  2003
The kitchen and serving lines were expanded.  New kitchen equipment was installed, as well as a new roof.  The dining area was completely renovated.
After  
       
 

    

Middle School
Elkhart ISD 
Elkhart, Texas  2003
12,744 sq. ft. new Middle School building, including nine classrooms, computer labs, student restrooms, and teacher workroom.  The exterior of the building matches the existing campus aesthetic and the building is master planned for future expansion.  All interior walls are of masonry construction.
     
       
 

    

Elementary & Middle School
Garrison ISD 
Garrison, Texas  2003
32,833 sq. ft. new Elementary and Middle School building.  Houses 3rd-8th grade and includes a media center, computer lab, and a science lab.  Existing campus aesthetic was matched while the building maintains its own identity.
     
       
 

    

Early Childhood/Music/Activity Building
Hemphill ISD 
Hemphill, Texas  2003
9,250 sq. ft. building houses a gymnasium and classrooms.  Gymnasium features Sports Court flooring, Retractable basketball goals, and height adjustable basketball goals.  The facility also features a large covered pick-up/drop-off area for the children. 
     
       
 

    

Vocational Building
Woden ISD 
Woden, Texas  2002
12,750 sq. ft. building to house the vocational classrooms and work areas.  Includes a welding lab, four vocational classrooms, a drive-through shop, food lab, and sewing lab.
     
       
 

    

High School & Gymnasium
Woden ISD 
Woden, Texas  2002
76,000 sq. ft. new High School building, including 2,000 above court fixed seat gymnasium, nineteen classrooms, computer and science laboratories, administration offices.  Site improvements include new entrance drive, parking and major drainage improvements.
     
       
 

                                                    

Bandhall/Agriculture Building
Hemphill ISD
6,500 sq. ft. band hall with 6 practice rooms, uniform storage, instrument repair facility, music library and offices.  Features internal restrooms with dressing areas.  6,800 sq. ft. vo-tech facility with 3 instructional rooms, Cisco room, offices, restrooms, tool room and drive through shop.
  
       
 

                                           

Gymnasium/Bandhall Building
Shelbyville ISD
Shelbyville, Texas   2002
32,000 sq. ft. High School competition gymnasium with 1,300 above court fixed and operable seating.  Music complex, including rehearsal hall, practice rooms and instrument storage rooms. 
 
       
 

    

Multi-Purpose Facility
Martinsville ISD
Nacogdoches County, Texas 1999
31,500 sq. ft. multi-purpose facility with Cafetorium, Band Hall, Competition Gymnasium, All-Sports Locker Facilities, Media Center and Administration Offices
  
 

    

High School Addition
Colmesneil ISD
Colmesneil, Texas  1999
17,000 sq. ft. facility with seven Classrooms with Media Center, Science Technology Lab and Administration
   
       
 

           

High School
New Summerfield ISD
New Summerfield, Texas  1999
15,000 sq. ft. facility with ten Classrooms including Science Lab, Computer Lab, Food Lab and Sewing Lab
  
       
 

    

Dunbar Primary School
Lufkin ISD

Lufkin, Texas  1998
Renovation of Old Dunbar High School into a new Primary School plus addition of new Activity Building and parking facilities.
 
       
 

    

Elementary School                                 Colmesneil ISD
Colmesneil, Texas 1998
25,500 sq. ft. facility with twenty Classrooms and Media Center

Elementary Classroom Building
Colmesneil ISD
Colmesneil, Texas   1991
3,800 sq. ft. Four-Classroom Building Addition
  
       
 

    

Cafeteria  (Master Plan & Campus Improvements Project - 1997)
Garrison ISD
Garrison, Texas  1998
 
 
       
 

    

Middle School and Administration Buildings
Alto ISD
Alto, Texas  1996
26,000 sq. ft. with sixteen Classrooms with Media Center and Administration, plus Cafeteria Dining Expansion
         
       
 

           

Elementary Building
Central ISD
Pollok, Texas  1993
21,000 sq. ft. facility with sixteen Classrooms, Library and Administration Building
  
       
 

           

Middle School Science Building
Jasper ISD
Jasper, Texas  1992
10,600 sq. ft. Sixth, Seventh and Eighth Grade Science building